
Overview
Product Specifications
Types & Key Metrics:
Hall Sensors
Field Range: 1–100 mT; Response Time: ~1 µs; Power Supply: 2–30 VDC; Output: Analog (voltage) or digital (switch)
Materials: InSb (antimony indium), GaAs (gallium arsenide), or silicon-based, with operating currents of 2–10 mA
Magnetoresistive Sensors (MR/GMR):
Sensitivity: 0.1–10 mV/V/mT; Linearity: ±0.5% FS; Temperature Range: -40°C to +150°C
Reed Switches:
Activation Field: 10–100 mT; Lifecycle: Up to 10^6 cycles; Contact Rating: 0.5–10 W
Design Features:
Packaging: IP67/IP69K for harsh environments (e.g., automotive, food processing)
Integration: IC-compatible designs (e.g., CMOS Hall sensors) for miniaturization
Product Grades
Standard Grade: General-purpose Hall sensors for consumer electronics (e.g., smartphone compasses)
Industrial Grade: Ruggedized MR sensors for automotive (e.g., wheel speed detection) or factory automation (e.g., position sensing)
High-Performance Grade: Precision GMR sensors for medical imaging (e.g., MRI) or aerospace (e.g., navigation systems)
Applications
Automotive:
Position/Speed Sensing: Crankshaft/camshaft detection, ABS systems
Current Monitoring: Battery management in EVs
Industrial:
Motor Control: Brushless DC motors in HVAC fans or robotics
Flow Measurement: Liquid/gas flow meters with magnetic impellers
Consumer Electronics:
Smart Device: Screen rotation (e.g., smartphones), lid detection (e.g., laptops)
Healthcare:
Biomagnetic Sensing: Heart rate monitors or MRI equipment
FAQs
How to choose between Hall and MR sensors?
Hall sensors suit low-field detection (e.g., proximity switches), while MR/GMR sensors excel in high-precision applications (e.g., angle measurement)
Temperature drift issues?
Built-in compensation circuits (e.g., temperature-stable GaAs Hall sensors) mitigate drift
Installation tips for reed switches?
Avoid mechanical stress; align with magnetic actuation direction (gap ≤2 mm)
Can sensors detect non-ferrous metals?
No—only ferromagnetic or magnetized materials (e.g., steel gears)
Lead time for custom designs?
Typically 4–8 weeks for specialized configurations (e.g., high-temperature variants)